NUCLEaR
CEA - COMMISSIONER FOR ATOMIC ENERGY

Design of a research and experimental laboratory. 
Design of P&ID and definition of skids integrated into fume cupboards, 
Material balance and U&ID 
Layout and guide plans 
Works contract and consultation 
Study of positions of control cameras by CAD simulation
ADF ORANO AREVA

Comurhex factory in Pierrelatte 
Pre-project migration to Plant 3D CAD 
Creation of 36 piping specifications 
Detailed studies (2000 pipes) 
HILTI support studies 
Piping, isometric and support plans